69 KV ELECTRIC TRANSMISSION LINE (LINE 120)

Dale Stockstill & Associates was tasked by South Mississippi Electric Power Association to provide all Surveying Services necessary for a new 13.4 mile Electric Transmission Line that is being built from Eucutta, Mississippi to Heidelburg, Mississippi. DS&A is providing to their client GPS control, Centerline Staking, Property Line Determinations, Right of Way Plats, Plan and Profile Drawings, Right of Way Clearing Limit Staking, Pole and Guy Wire Staking, and final As-Built Plans as necessary.

 