GPS Control Surveys
Dale Stockstill & Associates has completed control surveys for hundreds of miles of piepelines and electric transmission line along with many large constructiom sites and large topographic surveys for the Corps of Engineers.

CrewPipeline SurveyingContours and Underground Utilities
GPS Control Surveys
Dale Stockstill & Associates has completed control surveys for hundreds of miles of pipelines and electric transmission lines along with many large construction sites and large topographic surveys for the Corps of Engineers.  We have experience with conventional control techniques along with solid GPS post-processing procedures.  We have used post-processed GPS surveys to establish high accuracy control for several large topographic surveys which were completed using LIDAR along with setting precise monument control for the construction of several large Electric Generating Plants. Currently, DS&A is in its third option year with it’s New Orleans COE surveying contract. On every job done, we have set or confirmed TBMs or PBMs with varying degrees of order. A few or the projects completed by DS&A that show its expertise with GPS control are:

Line 168 (42 miles of existing Power Line in Marion, Covington, and Smith Counties, MS)
Line 232 (38.2 miles of new Power Line in Wayne, Clarke and Jasper Counties, MS)
  • South Mississippi Electric Power Association--GPS control was established by static observations using NGS monuments recovered along the length of the lines.  Once the primary control network was established, secondary horizontal and vertical control was extended from this basis.
   
Coldwater River Survey for the Vicksburg Corps of Engineers District
Contract No. W912EE-04-D-0004
Delivery order No. 9.
  • Control for this project was established using OPUS.
   
Mississippi River Delta Region, Davis Pond Freshwater Diversion and Lake Cataouatche Survey, New Orleans Corps of Engineers District
Contract No. W912P8-07-D-0028,
Job 07-103C.
  • Primary horizontal and vertical control for this project was established by multiple OPUS sessions.  Secondary control was established by static observations and post-processing.
   
Topographical Survey for Bayou Bienvenue to Hwy 46 LPV 145 & LPV 146, St. Bernard Parish, LA.
Stations 372+25 to 1116+00.
Contract Number W912P8-07-D-0028
Job No. 09-023C
  • This project ran for almost 8 miles along the Mississippi River Gulf Outlet (MRGO). The control was established using multiple static GPS sessions on High Accuracy Reference Network (HARN) monuments adding rinex data from NGS to the observations for additional checks.
Applications
Digital Terrain Models (DTM)
Topographic Surveys
Route Surveys
Boundary Surveys
GPS Control Surveys
Hydrographic Surveys
Geodetic Surveys
As-Built Surveys
Construction Staking
Pipeline Surveying